Monday, November 18, 2013
Assignment 5 (super super super super late)
One of the most valuable lessons of the design and production of our team's hoop house is that nailing down issues of ease of assembly and efficient use of material during the design process saves you a lot of pain in the ass during the actual physical assembly of the product. Additionally, our group experienced how time consuming dFab can actually be. We spent an entire afternoon there waiting for our pieces to be done. After all, even though using the CNC took a lot of time and effort, it still proved to be more efficient than actually going to woodshop and cutting all of the pieces by hand.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment